City Of Tallahassee - TPS Waste Water Treatment Plant

The City of Tallahassee's Wastewater Treatment Division provides for the pumping of wastewater from the Wastewater Collection System to the Thomas P. Smith (TPS) Water Reclamation Facility. The TPS facility has a capacity to treat 26.5 million gallons of wastewater a day that meets and exceeds all local, state and federal permit standards. The wastewater treatment process insures the public trust by protecting the health, welfare and safety of our community and our precious natural water environment.

Challenges

Data was always a challenge to pull from the Work Management System as it was complex and hard for the business user to understand. City Management wanted to become a more metric driven organization and keeping track of Key Performance Indicators (KPIs) was a challenging exercise. Traditional old fashioned reports were available but modifying them was expensive and time consuming. There was no central way to interrogate the data and get quick answers to questions about how the plant is performing.

Solution

COT worked closely with CHAMPS Analytics to consolidate the data from their CMMS system and load it into Qlik. After loading over 40 tables from the SQL Server, Work Management and Operations Department can optimize their work schedule, load balance all assignments and manage their plant assets more effectively. Since 2016, over $6 million dollars in process improvements have been made by simply analyzing the data and operating more effectively. All the major KPIs to run the plant more effectively are now available and updated multiple times a day.

Testimonial

“With Qlik, we are immediately able to improve our work management processes which results in millions of dollars in annual savings in how we maintain and manage our facility.”

Nico Lauw

Change Management Manager

Results & Client Value

Examples of how COT uses Qlik:

  • Ensuring all spending on assets are properly done on schedule and on budget
  • Eliminating duplicate work
  • Analyzing safety behavior
  • Holding Crew leaders accountable to completing work on time
  • Reducing the amount of Corrective work
  • Optimizing the Preventative Maintenance work
  • Optimizing staffing and work scheduling

Focused on the following KPIs:

  • $ Savings due process improvements
  • % of Completed Work Orders
  • Total Cost of All Planned and Unplanned Work
  • Total Hours of all Planned Work